Rio TintoDampier, WA6 months

Peninsula Palms - Dampier

A six-month, 160-room renovation prep program at Peninsula Palms, Dampier. Meticulous internal demolition and disposal delivered under strict safety protocols, with every wall cavity encapsulated for insulation and structural integrity before the renovation trades arrived.

At a glance

0

Rooms prepared

End-to-end

0

Months on site

Delivered on schedule

0

Stop-work events

Across the program

0%

Photo-documented

Every room, every day

Brief

What we were asked to do

Rio Tinto's Peninsula Palms accommodation needed a full internal renovation across 160 rooms. The brief was to strip the rooms back to a clean, sound substrate that the renovation contractor could pick up from - with no surprises, no missed contamination, and no asbestos cross-contamination.

The challenge

What made this one hard

  • Volume: 160 rooms inside a six-month window without compromising safety
  • Contamination management: each room independently risk-graded before any tools touched it
  • Asbestos boundary: any suspect materials had to halt scope and trigger licensed-contractor referral
  • Sequencing: rolling 4-room work fronts so the renovation contractor could shadow our handovers

Our approach

How we delivered it

  1. Pre-works contamination mapping across all 160 rooms, with risk-graded zones
  2. Controlled internal strip-out under containment, in 4-room work fronts
  3. Insulation removal, waste classification, segregated disposal
  4. Wall-cavity encapsulation across the entire footprint
  5. Daily photo reporting per room, consolidated weekly progress packs

Equipment & methodology

  • Class H industrial vacuums
  • Negative-pressure containment per work front
  • Encapsulation spray systems
  • Waste classification and bagging stations

Outcome

What changed for the client

  • 160 rooms handed over substrate-ready, on schedule
  • Zero stop-work events across six months on site
  • Full close-out pack - methodology, materials, photo evidence per room
  • Renovation contractor commenced fit-out the day after handover